Sixwaysrugby Home

The East Stand Development May 08 to September 08

Sixwaysrugby Forum  
Week 1 Week 2 Week 3 Week 4 Internals Week 6 Week 7 Week 8 Week 9 Week 10 Changes 1  
Changes 2 Week 11 Week 12 Week 13 Week 14 Week 15 Week 16 Week 17 Week 18 Week 19 Week 20  

From This - May 2008 To This - September 2008
               
Welcome to week 7

We can now see the stand start to take shape looking from the corner of the Sixways Suite Lower

The paviors are stacked ready to put down once completed. This is where your dedicated tile will go

You can see how the stand will dominate the view from the Sixwats Suite

               
Another view from the corner of the pitch looking towards the Southeast corner.

The support structure for the floor is now going in, as is the roof for the debenture bar

 

               
The concrete bases for the new 4 rows of seats is now almost complete
               
This is the extension at the south end of the east Stand.

Expect to see our visitirs sat here as we sell more and more season tickets.

It will still be a better view than visitors get at The Rec

               

a View fron the North West Corner Close-Up of the honeycomb floor
   
The Grass gets a refreshing drink: Looking Good by the way Compare the size of the stand with the 2 men on the frame
Clearly see the 4 new rows. It might not seem much but when you consider that there are only 9 rows of seats showing and this will take it to 13 almost 50%
               
Look at the sheer size of the stand in comparison to the North stand.

The North and West Stands are going to look so yesterday.

Had a chat with the builders and they believe we will be building the North Stand next summer.

YES!!

               
Tclose up of the new rows and the damage caused by the strong winds over the last two weeks
               
Close up of the base of the Duckworth Suites
               
A View from the car park looking South.

Already it is looking awesome

               
The Same vie without the zoom
               
Looking due South down the length of the East Stand

Just look where the old East Stand finished and compare to wher it will be in Septemeber

               
In here will be two complete sets of stairs and lifts.

The back of the 3rd tier has still to be built out from the stand

               
A Wolves Supporter: I suppose you can't have everything A View looking North along the length of the East Stand
 
The steels will all be staying so not sure of looks The roadway is getting there??
               
The final layer of tarmac has been laid to merge the old road into the new roundabout.

It looks like a sharp left hander when leaving the roundabout and travelling towards the motorway.

It is a wide road though.

               
It gets pretty bust travelling towards Droitwich.

Once completed it will be a great approach to the clu with a huge stadium to your left. Swing round the roundabout and drive in with the brand new east stand reception block facing you

               
Here is one view of the new roundabout from the raised ground just to the side of the new road
               
A great view of the East Stand looking South West.

The South stand will be obliterated by the huge East Stand

               
The new roundabout.
               
The Wanderer's Changing Rooms
               
A view of the new approach road leading towards the canal bridge.

This will be the new road to Droitwich.