The East Stand Development May 08 to September 08

Sixwaysrugby Forum  
Week 1 Week 2 Week 3 Week 4 Internals Week 6 Week 7 Week 8 Week 9 Week 10 Changes 1  
Changes 2 Week 11 Week 12 Week 13 Week 14 Week 15 Week 16 Week 17 Week 18 Week 19 Week 20  
From This - May 2008 To This - September 2008

               

To the Magnificent New East Stand 2008

               

The NEW East Stand - From The Westies

The Famous WeZZZZZt Stand - From The "Duckworth Suite"

A Huge, Huge thanks to Shaun Roberts and Chris Rhodes who not only allowed me onto the site but gave me an escorted tour of the whole stand

Thanks Guys

All supporters can now see the enormity of their new stand

               
A view from the top floor looking towards the North West Corner
               
The same view moved slightly to the right. Taking in the front of the corporate boxes
               
The southern end of the Corporate floor looking over along the South Stand

It totally dominates the South Stand and has a fantastic view.

I suspect the boxes will be in high demand, first come first served.

               
A view out from the boxes towards the m

Malverns

               
We can see here the smaller 12 person boxes marked out on the floor.

The view looks through the Duckworth Suite to the 600 seated restaurant.

               
The same view looking straight down it is a huge area
               
The corridor down the back of the corporate floor.

I feel this are will become a very useful area for meeting away from the crowd

A lot of work can get completed here and the view is.....

               
Pretty good as well

Looking over the new roadways and when all has been landscaped it will be pretty impressive indeed.

               
This is a view looking into the "Tower"

The floodlights for this corner will be mounted on an extended support off the tower

Confirmed today there will not be a camera Gantry on the East Stand and no floodlights along its length.

They would be too low and get in the players eyes.

               
Now at the North end over looking the "Bike Shed"

Imagine this view when we have our "New" North Stand.

The Shed will be known as the "Kukri Stand"

               
Still on the top floor looking South
               
Moved down a floor now to "The Debenture" and Season Ticket floor

A massive standing area here with a bar at each end.

Another place I believe will be come incredibly popular with supporters

               
A view from the top row of  seats looking towards the North Stand

You can make out here the tower 1st floor.

               
A view looking North along the new seats
               
Looking South
               
The guys are hard at work producing a great stand
               
The Corporate Floor The First Floor Area
First Floor AGAIN Panels going in - much brighter
Back outside now knee deep in muck and water

The back panelling is finish the stand of nicely

               
All the underside still to be filled in.

It will then look amazing

The turnstiles will be level with the outside supports

               
Now that's TALL!!!
               
Ground Level looking north along the seating area
               
The reception, office block and private entrance for the corporate's and their guests.

A place to feel proud of when inviting your friends and colleagues.

               
The North Stand when completed will come out this far.